The apartments are arranged across three five-storey blocks, with commercial and community units, including a creche at ground floor level. In-situ reinforced concrete frame structures have been adopted as the preferred method of construction to ensure delivery of the apartments within the very tight 18-month delivery programme. This construction approach was fully within the control of the contractor, whereas the feasible off-site structural frame options would not be.
Our team was appointed as part of a development partnership arrangement between the council and GEM Construction to deliver civil, structural, mechanical and electrical engineering services on the scheme.